  • Which statement best describes the PPE typically required for elevated work on NYC construction sites?
  • Which materials are explicitly listed as possible components of the sidewalk shed parapet?
  • Who is exempt from Local Law 52 of 2005 (Supported Scaffold Training)?
  • On wood pole scaffolds, when a new working level is desired, which of the following shall be left undisturbed until the new working level is framed?
  • What material must interior scaffolds taller than a threshold be constructed from?
  • What is the primary purpose of posting the Site Safety Plan, permits, safety signage, and emergency contact information on site?
  • Which material is NOT listed as an allowed material for the sidewalk shed parapet?
  • Which of the following is NOT one of the four main suspended scaffold inspections mandated by the Building Code?
  • Owners of adjoining structures may be required to allow a representative of the construction site access to the property to inspect in order to:
  • This is one of NYC DOB requirements when using supported scaffolds located at the edge of buildings and within 1.5 times the height of the scaffold: Requires all sides of the scaffold facing an unenclosed perimeter be provided with debris netting and guardrails
  • What is the required frequency for on-site safety inspections by the Site Safety Manager?
  • Sidewalk shed decks on buildings less than 100 feet in height may be designed to carry live loads of how many pounds per square foot?
  • What is the role of cooperation between Safety Coordinators and the SSM on a site?
  • What is included in atmospheric testing requirements for confined space entry?
  • Under NYC DOB rules, a Site Safety Coordinator is designated for buildings with what height range?
  • What must be done with defective tools or equipment on a site?
  • On a steel project, a steel beam has been dropped and bent. What must be done?
  • If an open excavation has been discontinued or interrupted for at least ___ months, the lot shall be filled and graded to eliminate all steep slopes, holes, obstructions, or similar sources of hazard.
  • In case of an accident involving the public, the Site Safety Manager must call which number?
  • Which item is NOT mandated in Chapter 33 when carrying hoses, wires, ropes, or chains over sidewalks to prevent tripping?
  • How must hot work be controlled on an NYC construction site?
  • If a sidewalk shed is required for the erection of a structure, how long must the shed remain in place?
  • In buildings undergoing demolition that have existing sprinklers, the sprinklers shall be maintained as__________.
  • When a sidewalk shed is required during the demolition of a structure, the sidewalk shed shall be completed:
  • The sidewalk shed parapet must use a galvanized wire screen not less than which gauge and debris mesh size?
  • Which codes or standards are typically relevant for NYC SSM certification?
  • A ramp for a power buggy must be designed to support how many times the maximum intended live load
  • According to 3314.8.2, debris netting on scaffolds must be enclosed with a wire screen not less than which wire mesh, and with a maximum which mesh?
  • Openings in construction fences, railings or sidewalk sheds for loading purposes may be open only at certain times. Which statement is MOST accurate?
  • Interior scaffolds exceeding how many feet in height must be constructed of fire retardant materials?
  • If a protective structure obscures a lawful sign, what maximum sign size is allowed to be affixed to the sidewalk shed face?
  • What is the significance of a 'closed loop' hazard identification process?
  • What must be done when materials are being lifted over a sidewalk shed?
  • In which scenario is diagonal bracing required?
  • Floor slabs in non-combustible construction to an elevation not more than how many feet may be removed to provide temporary debris storage?
  • According to Chapter 33, Section 3310, when is a Site Safety Coordinator is used in place of a Site Safety Manager?
  • Which elements constitute hazard communication (HazCom) implementation on a NYC site?
  • When sustained winds or gusts at the site exceed how many mph should exterior scaffolds cease operation?
  • What is the function of a Site-Specific Safety Orientation?
  • During demolition, how should non-automatic and Siamese sprinkler connections be identified?
  • Which document must define site-specific safety controls, hazard controls, and inspection frequencies for NYC construction sites?
  • According to NYC DOB, how many years is the 32-Hour Rigging Supervisor Training valid for and how many hours is the required refresher course?
  • Which statement best describes the role of toolbox talks in coordinating safety on site?
  • What is the minimum height for construction fences?
  • How many days are required to notify the adjoining neighbor(s), when contractors need to access their property?
  • What is the minimum height at which a guardrail system is required on a typical NYC scaffold or unprotected edge?
  • In NYC, how often must a Site Safety Plan be reviewed and updated during a project?
  • What is the purpose of a Job Hazard Analysis (JHA) or Task Hazard Analysis (THA) in NYC site safety?
  • How should 'serviceable fire extinguishers' be maintained on site?
  • If a concrete reshore post falls outside the stripping floor into the horizontal net, what should the Site Safety Manager do?
  • Viewing panel size required in solid construction fences?
  • When chutes are more than 75 feet in height they shall be constructed using:
  • What is the typical requirement for risk assessment when changing methods or tasks on-site?
  • In what instance must a sidewalk shed be erected regardless of height or sidewalk distance?
  • What constitutes the Site-Specific Safety Orientation content?
  • What is the working load for full thickness lumber spanning eight feet according to Table 3314.5.2?
  • Which of the following is NOT a requirement for temporary stairs on NYC sites?
  • Before leaving a crane or derrick unattended, the operator shall:
  • Which document governs fire protection measures on NYC construction sites?
  • What is the minimum bumper or curb for a floor level chute opening?
  • A sidewalk shed may be removed after demolition when the building has been razed to what point?
  • How is fire protection integrated into site safety measures according to NYC practice?
  • Which document is required for Cranes and Derricks approvals onsite?
  • What is the role of daily safety inspections in the Site Safety Manager's duties?
  • What is the color specified for the new construction fence?
  • What is the minimum distance that concrete washout water must be kept from sewer, drains, and catch basins?
  • The top rail of a standard guardrail must be capable of withstanding which force without failure?
  • The 3 ft 6 in parapet height is measured from which part of the sidewalk shed?
  • Scaffolds shall be capable of supporting, without collapse, not less than how many times the maximum weight required to be suspended therefrom or placed thereon?
  • What must you obtain before using or removing equipment involved in an accident on the site?
  • Excavated material and superimposed loads such as equipment, trucks, etc., shall not be placed closer to the edge of the excavation than a distance equal __________ the depth of such excavation, unless the excavation is in rock or unless the sides of the excavation have been sloped or sheet piled (or sheeted) and shored to withstand the lateral force imposed by such superimposed loads.
  • When is a sidewalk shed not required?
  • What is the primary role of the Site Safety Manager on an NYC construction site?
  • How should concrete washout water be handled?
  • How should 'electrical cords and hoses' be managed on site?
  • When sidewalk sheds are required during demolition, they must be completed before any work begins.
  • What are the specific notifications for excavation in NYC?
  • Which document governs the placement and operation of cranes on NYC construction sites?
  • Which agency promulgates rules for tree protection on construction sites?
  • What should be done when a hazardous condition is identified in terms of documentation?
  • On wood pole scaffolds, when a new working level is desired, the existing ______ shall be left undisturbed until the new working level is framed.
  • According to Site Safety Manual, the Site Safety Manager's main responsibility is to
  • The definition of _____________ is: a horizontal transverse scaffold member (which may be supported by legs or runners) upon which the scaffold platform rests and joins scaffold uprights, posts, poles, and similar members.
  • The minimum live load for sidewalk sheds protecting buildings 100 feet or higher is:
  • Open web steel joists that are hoisted singly shall be transferred from their place of storage directly to ____________.
  • According to Chapter 33, Section 3307.4.2, the section on 'Dangerous Areas', storage of flammable materials and/or explosives must be________
  • What are the four main suspended scaffolds inspections mandated by the NYC Building Code (Chapter 33 Section 3314-scaffolds)?
  • Which of the following is a valid Site Safety Manager qualification combination?
  • What debris mesh size is specified for the sidewalk shed parapet screen?
  • What training records must be kept for SSM compliance?
  • Which option correctly states a not-mandated practice for crossing sidewalks with equipment to prevent tripping?
  • Which of the following represents a complete set of records to present to DOB upon request?
  • Scaffold planking must extend a minimum of how many inches over the supports?
  • The Site Safety Manager must ensure compliance with requirements from which NYC regulatory body?
  • What is the minimum dimension for the curb used for a motor vehicle ramp?
  • Horizontal safety netting is required on any building of at least what height?
  • What is the purpose of tool lanyards on NYC sites?
  • If a hazardous condition is identified on-site, what is the first action required?
  • Runways and ramps used for wheelbarrows, hand carts and hand trucks must be at least ______ in clear width.
  • What thickness plank must be used for runways for motor vehicles at NYC construction sites?
  • Which authority might need to be notified when hazardous conditions are identified, if required?
  • Chapter 33, Section 3305.3.2.6.3- Where shore height exceeds ____ feet, or when necessary to provide structural stability, diagonal bracing shall be provided.
  • Putlogs for single pole scaffolds shall be set with the greater dimension vertical and project beyond the outer edge of the poles by at least how many inches?
  • For a 2 by 8 member, what is the size and number of nails required according to Table 3314.12.3?
  • What is the minimum height for construction fences?
  • For foundation operations that may affect adjacent properties, how many days written notice must be given to the owner of the affected property?
  • What is the minimum height of the vertical parapet along the sidewalk shed edges?
  • Which numbers must be noted for NYC excavation work notifications?
  • In structures undergoing demolition, how must the existing sprinkler system be maintained?
  • Which agency approves pumping-out water from demolition or excavation operations?
  • The sidewalk shed deck extension of at least 20 feet beyond the building line is required when construction is greater than what height?
  • In demolition work, it shall be a violation to use mechanical equipment without what?
  • Which ladder practice is NOT recommended?
  • What is the role of a Safety Coordinator on NYC construction sites?
  • What is the purpose of 'daily safety briefings' or toolbox talks?
  • Which measures are typically used to control electrical hazards on a NYC construction site?
  • What should be included in the Safety Log regarding safety activities?
  • Prior to using any mechanical demolition equipment, what must be approved?
  • If exterior walls are not in place below the stripping floor, material piles must be kept from the perimeter at least how many feet?
  • Which professional must determine a corrective action for a damaged steel beam?
  • What is the maximum allowable loading for an outrigger scaffold?
  • When a sidewalk shed is required during demolition, the shed can be removed under which condition?
  • Who shall inquire into the cause of any accident involving equipment on the site?
  • What is the purpose of barriers and signage around a construction site?
  • What is the minimum distance for concrete washout water from sewer, drains, and catch basins?
  • For light-duty two-point adjustable suspended scaffolds in NYC, what rope grade is required?
  • What is the minimum height of a scaffold that requires a permit?
  • For sidewalk sheds that provide protection for buildings 100 feet or higher, the deck shall be designed and constructed to carry a live load of at least _______.
  • Putlogs for single pole scaffolds shall be set with the greater dimension in which orientation?
  • When exterior walls are not in place below the stripping floor, material piles shall be kept at least ____ feet back from the perimeter.
  • If a protective structure obscures a lawful sign, which statement is allowed by the code?
  • What is the standard for 'ladders' on NYC construction sites?
  • Which OSHA subpart covers scaffolding safety that is typically enforced on NYC sites?
  • Which statement about debris removal is true?
  • On a NYC construction site, how should scaffolding be inspected and by whom?
  • Which statement about guardrail top rail height is accurate?
  • For a 60-foot high heavy-duty wood pole scaffold, what is the required dimension for the upright or pole?
  • Under Chapter 3301, which item is exempt from pre-use inspection due to affecting public safety?
  • Which statement best describes a confined space on a NYC construction site?
  • Who shall inspect construction equipment that might affect public safety before it is used for a specific job at the construction site?
  • What is the minimum width for a ramp used for motor vehicles?
  • What is the minimum wire mesh size specified for debris netting used on scaffolds?
  • What is the definition of soil and foundation work?
  • How should near-miss incidents be handled under NYC SSM practices?
  • What are the qualifications for becoming a Site Safety Manager?
  • If a structure has been weakened by fire, flood, explosion, or age, what must be done?
  • Which statement about a closed-loop hazard identification process is correct?
  • Who must the Site Safety Manager coordinate with on site to ensure safety coverage?
  • When doubt exists as to the proper load for a powder-actuated tool, a trial shot shall be made using what setting?
  • Which practice is described as part of the dust and noise control plan?
  • Which statement about hot work permits is correct?
  • What constitutes a 'hot work permit' and when is it required?
  • What is the difference between Active and Passive fall protection?
  • A new building with a footprint of 90,000 square feet requires how many watchpersons on the site without a variance?
  • What is the required Cranes and Derricks approved form for the designated A/D Director onsite?
  • In the context of dangerous areas, the storage of flammable materials must comply with the requirements of which agency?
  • Who is exempt from the requirements of Local Law 52 of 2005 (Supported Scaffold Training)?
  • When a building being constructed or demolished occupies a ground area of more than ______ sq. ft., and up to ______ sq. ft., a competent watchman shall be on duty at the site during all hours when operations are not in progress.
  • Which role is required during entry into a confined space?
  • When an excavation is planned within 200 feet of a subway, which agency must approve the permit?
  • Which control is prioritized highest in the controls hierarchy?
  • What actions are typical in inclement weather to maintain site safety?
  • According to DOT regulations, building materials stored in the street must be enclosed by a barricade or fence at least how many feet high?
  • Which type of scaffold is associated with the four main inspections mandated by the Building Code?
  • Which of the following is a valid combination for Site Safety Manager qualifications?
  • Before a demolition begins, what is not necessary to be performed?
  • Which statement best describes the daily documentation produced by the Site Safety Manager?
  • Whenever the working deck reaches a height greater than ___ stories, at least one elevator must be kept in readiness for the fire department?
  • The deck and the substantial enclosure of a sidewalk shed shall be extended parallel to the curb at least 20 feet beyond the building line when construction is_______
  • Which is the minimum clear width for runways and ramps used for wheelbarrows, hand carts and hand trucks?
  • What is the minimum dimension for the curb used for a motor vehicle ramp?
  • Footbridges shall be not less than how many feet wide, capable of carrying a live load of 150 PSF?
  • What is the difference between a Site Safety Manager and a Safety Coordinator?
  • When an excavation or drilling is planned deeper than 500 feet below grade, which agency must approve the permit?
  • According to Table 3314.5.2, full thickness lumber (2 inches) spanning 8 feet will result in a working load of _______? Please refer to your chapter 33 book for the table.
  • Design drawings for concrete formwork are required wherever which condition is met?
  • Who has authority to stop work due to unsafe conditions on a NYC construction site?
  • What is the threshold for requiring horizontal safety netting on buildings, stated as stories height?
  • How should 'recordkeeping' be conducted to demonstrate SSM compliance during an NYC DOB inspection?
  • Who administers the SSM certification in NYC?
  • According to DOT regulations, cranes foundation must be designed so that the pressure applied to the sidewalk shall not exceed how many pounds per square foot?
  • If water accumulation from demolition or excavation needs to be pumped out, which agency approves the operation?
  • Which of the following statements is true regarding the ramp design for power buggy load?
  • A Site Safety Coordinator becomes very sick on the job and needs medical attention. What is the most appropriate procedure to follow?
  • In lieu of sheeting, excavated slopes may be inclined not steeper than what degrees?
  • An Emergency Action Plan for a NYC job site must include which elements?
  • How does the SSM handle 'loss of power' or 'equipment failure' on site?
  • Which of the following must be completed before removing a sidewalk shed?
  • What is a Safety Log and why is it important on NYC sites?
  • For a building 40 feet or more in height, when must the sidewalk shed be in place?
  • The top rail of a standard guardrail (excluding site perimeter over 4 stories or 40 feet) must be at what height?
  • How should dust and noise control be managed on a NYC site?
  • What is the maximum opening for horizontal fine mesh debris netting?
  • Which items must be posted on the job site for safety?
  • In the event of a loss of power or equipment failure, which action should the SSM avoid?
  • Viewing panels 12x12 shall be provided in solid construction fences at a distance of one viewing panel per how many feet?
  • All non-scaffold platforms require a standard guardrail at a height of how many feet above the adjoining ground?
  • When must fall protection be used according to OSHA/NYC standards on a construction site?
  • A ______shall be provided at the lower end of every chute to control the unloading of material.
  • At what grade must power buggy brakes be capable of being fixed in engagement to hold a full load stationary?
  • What kind of license is required to operate a crane with a 250-foot boom?
  • Which scaffold component is a horizontal transverse member upon which the platform rests and joins scaffold uprights?
  • Which condition triggers the mandatory erection of a sidewalk shed regardless of other parameters?
  • Debris must be removed from floors with what frequency?
  • How should fall arrest systems be anchored on scaffolds and elevated work platforms?
  • When should a JHA/THA be conducted?
  • Full and partial demolition operations shall be conducted in accordance with submittal documents. What are the exceptions to the rule?
  • Which permits are common prerequisites for starting work on an NYC construction site?
  • What is the purpose of a 'controls hierarchy' on a construction site?
  • In the event of a fire, what is the required action for occupants and workers on the construction site?
  • Which of the following is a typical element of fall protection on NYC construction sites?
  • Which activities are included in the definition of soil and foundation work?
  • On a two-point suspended scaffold, how many workers are allowed, and what is the exception?
  • What component is used at the lower end of a chute to control unloading?
  • What is the recommended practice for 'temporary stairs' and access on NYC sites?
  • What qualification must a person have to serve as the Site Safety Manager under NYC requirements?
  • Design is not required for a single tier nonadjustable suspended scaffold whose platform is how many square feet or less in size?
  • Who determines the necessary demolition measures for a structure weakened by disaster?
  • When salamanders are used to heat concrete, what safety feature must be provided?
  • Protection of trees will follow the rules and regulations promulgated by ______
  • The permanent floors of skeleton steel construction shall be installed as soon as possible as steel installation progresses. In no case shall there be more than _________ or equivalent levels or __________, whichever is less, between the erection floor and the uppermost permanent floor.
  • How does the SSM ensure coordination with other on-site safety professionals (e.g., Safety Coordinators, Safety Monitors)?
  • Viewing panels are to be placed at a distance of one panel for every how many feet?
  • What should a confined space rescue plan include?